Skip to main content
Loading

Subsidiaries

POWERGRID Himachal Transmission Limited

Acq Date :  
Date of Incorporation :  
Commissioned
Business Subsidiaries
Annual Report -
  (3.38 MB)
Financial Statements -
 AR_FS_0.pdf (4.42 MB)
Director List
  1. 400 kV Quad Bundle Conductor Double Circuit Line from Karcham Wangtoo HEP Pothead yard at Wangtoo to Abdullapur (219.80 KM).
  2. LILO of Baspa-Naptha-Jhakri Transmission Line (4 KM)
  3. 2 nos. of 400 kV line bays at POWERGRID Abdullapur substation & 2 nos. 3-phase shunt Reactors of 80 MVAR each at Wangtoo Power House.