POWERGRID ER NER Transmission Limited
Acq Date :
Date of Incorporation :
Financial Statements -
Director List
Under Implementation
TBCB Subsidiaries
Annual Report - AnnualRepot2122.pdf (2.77 MB)
PENTL.pdf (27.48 MB)
Scope
1) Creation of 220kV GIS bus at Banka (POWERGRID) S/s
2) 400kV bus extension works at Banka (PGCIL) 400/132kV Substation
3) 400/220kV, 2x500MVA
ICTs along with associated bays (220kV bays in GIS and 400kV bays in AIS)
4) 2 nos. of 220kV GIS line bays at Banka (POWERGRID) for termination of Banka (POWERGRID)–
Goradih (Sabour New) 220kV D/C line of BSPTCL
Future provision: Space for future 220kV GIS bays: 6 no.
5) Upgradation of existing 132kV Namsai (POWERGRID) S/s to 220kV (with 220kV side as GIS)
6) Kathalguri (NEEPCO) – Namsai (POWERGRID) 220kV D/c line
7) Extension at Kathalguri (NEEPCO) switchyard: 2 nos. of GIS line bays for termination of Kathalguri
(NEEPCO) – Namsai