Skip to main content
Loading

Subsidiaries

POWERGRID Aligarh Sikar Transmission Limited

Acq Date :  
Date of Incorporation :  
Under Implementation
TBCB Subsidiaries
Annual Report -
 PASTL_AR.pdf (2.48 MB)
Financial Statements -
 6PASTL.pdf (3.6 MB)
Director List

Formerly known as Sikar-II Aligarh  Transmission Limited

1) Sikar-II - Aligarh 765kV D/c line

     Future provisions:
  • Space for 400/220 kV ICTs along with bays – 10 nos.
  • 400 kV line bays – 6 nos.
  • 220 kV line bays – 16 nos.
  • 420 kV reactors along with bays – 2 nos.
  • Suitable bus sectionaliser arrangement at 400 kV and 220 kV

2) Bikaner-II PS – Khetri 400 kV 2xD/c line (Twin HTLS on M/c Tower)

3) 1x330 MVAr switchable line reactor for each circuit at each end of Sikar-II – Aligarh (GIS) 765kV D/c line

  • 330MVAr, 765 kV reactor- 4 (2 reactors each at Sikar-II and Aligarh)
  • Switching equipment for 765 kV reactor - 4 (2 Switching equipment each at Sikar-II and Aligarh)
  • 110 MVAR, 765 kV, 1 ph Reactor (spare unit) at Aligarh-1