Transmission System Strengthening Scheme for Evacuation of Power from Solar Energy Zones in Rajasthan (8.1 GW) under Phase-II Part-E on build, own, operate and maintain basis (hereinafter referred to as “the Project”) consisting of the following elements:
- Bhadla-II PS – Sikar-II 765kV D/c line (2nd)
- 2 no. of 765 kV line bays each at BhadlaII and Sikar-II for Bhadla-II PS – Sikar-II 765kV D/c line
- 1x330 MVAr switchable line reactor for each circuit at Sikar-II end of Bhadla-II PS – Sikar-II 765kV D/c line 330 MVAr, 765 kV reactor- 2 Switching equipment for 765 kV reactor - 2
- 1x240MVAr switchable line reactor for each circuit at Bhadla-II end of Bhadla-II PS – Sikar-II 765kV D/c line
- 240 MVAr, 765 kV reactor- 2 Switching equipment for 765 kV reactor - 2