Skip to main content
Loading

Subsidiaries

POWERGRID Bhadla Sikar Transmission Limited

Acq Date :  
Date of Incorporation :  
Under Implementation
TBCB Subsidiaries
Annual Report -
 PBSTL.pdf (9.77 MB)
Financial Statements -
 29PBSTL.pdf (13.25 MB)
Director List

Transmission System Strengthening Scheme for Evacuation of Power from Solar Energy Zones in Rajasthan (8.1 GW) under Phase-II Part-E on build, own, operate and maintain basis (hereinafter referred to as “the Project”) consisting of the following elements:

  1. Bhadla-II PS – Sikar-II 765kV D/c line (2nd)
  2. 2 no. of 765 kV line bays each at BhadlaII and Sikar-II for Bhadla-II PS – Sikar-II 765kV D/c line
  3. 1x330 MVAr switchable line reactor for each circuit at Sikar-II end of Bhadla-II PS – Sikar-II 765kV D/c line 330 MVAr, 765 kV reactor- 2 Switching equipment for 765 kV reactor - 2
  4. 1x240MVAr switchable line reactor for each circuit at Bhadla-II end of Bhadla-II PS – Sikar-II 765kV D/c line
    • 240 MVAr, 765 kV reactor- 2 Switching equipment for 765 kV reactor - 2