Inner banner

POWERGRID Southern Interconnector Transmission System Limited

Sl.No Name of SPV Acq. date Details of Elements Project Status
1 POWERGRID Southern Interconnector Transmission System Limited 04.12.2015 a) Vemagiri-II – Chilakaluripeta 765kV D/C line with 240 MVAR switchable line reactors at both ends of each circuit. Under implementation
b) Chilakaluripeta – Cuddapah 765kV D/C line with 240 MVAR switchable line reactors at both ends of each circuit
c) Chilakaluripeta – Narsaraopeta (Sattenapalli) 400kV (quad) D/C line
d) 2 no. 400 kV line bays at  Narsaraopeta (Sattenapalli) 400kV sub-station of APTRANSCO
e) Establishment of 765/400 kV substation at Chilakaluripeta with 2x1500 MVA transformers and 2x240 MVAR bus reactors each.
f) Cuddapah – Madhugiri 400kV (quad) D/C line with 50 MVAR switchable line reactors at both ends of each circuit.
g) Srikaukulam Pooling Station – Garividi 400 kV (Quad) D/C line
h)2 no. 400 kV line bays at  Garividi 400kV S/s of APTRANSCO